Click the thumbnail image for a larger view.
|

(8/10/2010 SR0015-020)
|
Excavation for EB Collector/Distributor Road.
|

(8/10/2010 SR0015-020)
|
Bridge 3 - Abutment 1 formwork and temporary excavation shoring.
|

(8/10/2010 SR0015-020)
|
Bridge 1 - Formwork placement at Pier 1.
|

(8/10/2010 SR0015-020)
|
Bridge 1 - Predrilling at Abutment 2 for pile installation.
|

(8/2/2010 SR0015-020)
|
Completed Box Culvert Extension C1 at outlet end.
|

(8/2/2010 SR0015-020)
|
Bridge 3 - Phase 4 Construction. New bridge on right, existing bridge on left.
|

(8/2/2010 SR0015-020)
|
Bituminous base course placement on Ramp G (PA 581 EB to US 15 NB).
|

(7/23/2010 SR0015-020)
|
Formwork and reinforcing steel for top slab of Box Culvert Extension at outlet end.
|

(7/23/2010 SR0015-020)
|
Bridge 3 - Pier Cap Removal
|

(7/23/2010 SR0015-020)
|
Subbase placed on EB Collector/Distributor Road and Ramp G.
|

(7/16/2010 SR0015-020)
|
Bridge 1, Abutment 1 footing.
|

(7/9/2010 SR0015-020)
|
Box Culvert Extension C1 backfill at inlet end.
|

(7/9/2010 SR0015-020)
|
Placing 2A stone subbase on Ramp A.
|

(7/1/2010 SR0015-020)
|
Finished bottom slab concrete for Box Culvert Extension at outlet end.
|

(7/1/2010 SR0015-020)
|
Placing bottom slab concrete for Box Culvert Extension at outlet end.
|

(7/1/2010 SR0015-020)
|
Formwork and reinforcing steel for Box Culvert Extension bottom slab at outlet end.
|

(7/1/2010 SR0015-020)
|
Bridge 1, Abutment 2 excavation.
|

(7/1/2010 SR0015-020)
|
Concrete pipe installation in Ramp G infield.
|

(6/22/2010 SR0015-020)
|
Completed construction of Box Culvert Extension C1 at Inlet end.
|

(6/22/2010 SR0015-020)
|
Excavation for Stormwater Basin at the infield of Ramp G.
|

(5/29/2010 SR0015-020)
|
Bituminous Base on SR 0015 South Bound.
|

(5/27/2010 SR0015-020)
|
Placing Sealer on concrete pavement construction joint on Ramp F
|

(5/27/2010 SR0015-020)
|
Installing Permanent Barrier on Ramp F
|

(5/27/2010 SR0015-020)
|
Installing Permanent Barrier on Ramp F
|

(5/27/2010 SR0015-020)
|
Emergency access gate from SR 581 Eastbound to Spangler Road
|

(5/27/2010 SR0015-020)
|
Bridge 2 Pre-stress Box Beams Final Placement
|

(5/27/2010 SR0015-020)
|
Bridge 2 Pre-Stress Box beam Span 2 supported by Pier 1
|

(5/20/2010 SR0015-020)
|
Rollers compacting the wearing course surface on Hummel Ave.
|

(5/20/2010 SR0015-020)
|
Placing wearing course on Hummel Ave.
|

(5/20/2010 SR0015-020)
|
Rebar and formwork for the southbound median barrier on Bridge 1
|

(5/19/2010 SR0015-020)
|
Constructing formwork for end diaphragms for Bridge 3
|

(5/14/2010 SR0015-020)
|
Constructing formwork for intermediate diaphragms
|

(5/14/2010 SR0015-020)
|
Bridge 3 over Gettysburg Road completed bridge beam erection with temporary bracing and intermediate diaphragms
|

(5/14/2010 SR0015-020)
|
Bridge 3 over Gettysburg Road completed Stage 3 bridge beam erection
|

(5/12/2010 SR0015-020)
|
Positioning Prestressed Concrete I-Beam at Abutment 1 of Bridge 3 over Gettysburg Road
|

(5/12/2010 SR0015-020)
|
Positioning Prestressed Concrete I-Beam at Abutment 2 of Bridge 3 over Gettysburg Road
|

(5/12/2010 SR0015-020)
|
Lifting the Prestressed Concrete I-Beam off the delivery truck
|

(5/7/2010 SR0015-020)
|
Placing/Finishing RPS concrete pavement for Ramp F acceleration lane along existing SR 581 EB.
|

(5/7/2010 SR0015-020)
|
Temporary overhang falsework for modified Stage 4 pier cap placement at Pier 2 in foreground; installing formwork for Pier 1 stem wall (Modified Stage 4 - SB lanes only)
|

(5/7/2010 SR0015-020)
|
Installing rebar for north approach slab for bridge (Stage 2 - SB lanes)
|

(5/7/2010 SR0015-020)
|
Saturated burlap covers on finished concrete bridge deck (Stage 2 - SB lanes).
|

(5/6/2010 SR0015-020)
|
Drilling tie bar holes into existing EB lane
|

(5/6/2010 SR0015-020)
|
Recently placed concrete pavement in foreground and formwork for additional concrete placement in background.
|

(5/6/2010 SR0015-020)
|
Installing temporary bulkhead and preparing for Ramp F concrete pavement placement
|

(5/6/2010 SR0015-020)
|
Stage 3 Abutment 2 and Wing Wall C
|

(5/6/2010 SR0015-020)
|
Installing temporary structural backfill shoring for Stage 3 at Aburment 1
|

(5/5/2010 SR0015-020)
|
Pneumatic tire road roller compacting bituminous leveling course
|

(5/5/2010 SR0015-020)
|
Placing bituminous leveling course
|

(5/5/2010 SR0015-020)
|
Installing formwork for Pier 1 stem wall (Modified Stage 4 - SB lanes only)
|

(5/5/2010 SR0015-020)
|
CAT PM-565B Cold Planer milling bituminous pavement
|

(5/5/2010 SR0015-020)
|
Milled bituminous pavement
|

(5/5/2010 SR0015-020)
|
CAT PM-565B Cold Planer milling bituminous pavement
|

(4/29/2010 SR0015-020)
|
Placed saturated burlap curing covers on finished concrete bridge deck.
|

(4/29/2010 SR0015-020)
|
Placing concrete via pump truck for diaphragms at Pier 2
|

(4/29/2010 SR0015-020)
|
Placing saturated burlap curing covers on finished concrete bridge deck.
|

(4/29/2010 SR0015-020)
|
Placing and finishing bridge deck concrete
|

(4/29/2010 SR0015-020)
|
Placing bridge deck concrete via pump truck
|

(4/23/2010 SR0015-020)
|
Placing aggregate sub base for south bound SR 0015
|

(4/23/2010 SR0015-020)
|
Aggregate sub base for South bound SR 0015
|

(4/23/2010 SR0015-020)
|
Asphalt treated permeable base course for Ramp F concrete paving in forground and Ramp F 37.5 mm bituminous base course in background.
|

(4/23/2010 SR0015-020)
|
Asphalt treated permeable base course for Ramp F paving
|

(4/23/2010 SR0015-020)
|
Asphalt treated permeable base course for Ramp F concrete paving
|

(4/23/2010 SR0015-020)
|
New overhead sign structure (7E) for PA 581 West bound
|

(4/23/2010 SR0015-020)
|
New overhead sign structure (8E) for PA 581 East bound
|

(4/23/2010 SR0015-020)
|
New overhead sign structure (8E) for PA 581 West bound
|

(4/23/2010 SR0015-020)
|
New overhead sign structure (9E) for PA 581 East bound
|

(4/22/2010 SR0015-020)
|
Removing forms at Bridge 3's Abutment 2 and Wing C
|

(4/22/2010 SR0015-020)
|
Backfilling Bridge 3's Wing B
|

(4/22/2010 SR0015-020)
|
37.5 mm bituminous base course on Ramp F
|

(4/22/2010 SR0015-020)
|
Demolition of upstream Box Culvert 1 under SR 2014
|

(4/22/2010 SR0015-020)
|
Placing concrete via pump truck at Bridge 3 Wing C
|

(4/22/2010 SR0015-020)
|
Gormaco C-450 Finisher Machine and rebar for Bridge 1, Stage 2
|

(4/21/2010 SR0015-020)
|
Bridge 3 Abutment 1 and Wing B
|

(4/21/2010 SR0015-020)
|
Placing concrete via pump truck for Bridge 3 Abutment 2
|

(4/21/2010 SR0015-020)
|
Asphalt treated permiable base course for concrete paving of Ramp F
|

(4/5/2010 SR0015-020)
|
General progress for new Ramp F
|

(4/5/2010 SR0015-020)
|
General progress for new Ramp F
|

(4/5/2010 SR0015-020)
|
Hoe ramming for drainage pipe installation
|

(4/5/2010 SR0015-020)
|
Placing aggregate sub base for SR 0581
|

(4/5/2010 SR0015-020)
|
High velocity erosion control matting for drainage swell
|

(4/5/2010 SR0015-020)
|
Hoe ramming for drainage pipe installation
|

(4/5/2010 SR0015-020)
|
Reinforcement steel for Pier 1
|

(4/5/2010 SR0015-020)
|
Pumping concrete for Abutment 1 Stem Wall and Wing Wall B
|

(4/5/2010 SR0015-020)
|
Pier 2 formwork
|

(4/5/2010 SR0015-020)
|
Framing Abutment 2 and Wing Wall C footings
|

(4/5/2010 SR0015-020)
|
Drill rig excavating for caissons
|

(4/5/2010 SR0015-020)
|
Ground mounted sound barrier wall caissons
|

(4/5/2010 SR0015-020)
|
Retaining wall W1 with structure mounted sound barrier wall anchor bolts pertruding
|

(4/5/2010 SR0015-020)
|
Ground mounted sound barrier wall caissons
|

(4/5/2010 SR0015-020)
|
Reinforcement steel for cast-in-place end diaphragm; Stay-in-place forms/ temporary overhang falsework on right
|

(2/1/2010 SR0015-020)
|
Demolishing Existing Pier at Bridge 2
|

(2/1/2010 SR0015-020)
|
Forming New Pier Footing for Bridge 2
|

(2/1/2010 SR0015-020)
|
Demolishing Existing Pier at Bridge 2
|

(2/1/2010 SR0015-020)
|
Bearing Piles for Abutment Footing
|

(2/1/2010 SR0015-020)
|
Cassion Ready for Concrete Placement
|

(2/1/2010 SR0015-020)
|
Placing Concrete for Sign Structure 9E
|

(2/1/2010 SR0015-020)
|
Footer for Retaining Wall
|

(6/29/2009 SR0015-006)
|
Construction of US 15 bridge over Lower Allen Drive.
|

(6/29/2009 SR0015-006)
|
Excavation for cast-in-place concrete retaining wall along PA 581 Eastbound at ramp to I-83 Southbound.
|

(6/29/2009 SR0015-006)
|
Construction of cast-in-place concrete retaining wall along PA 581 Eastbound at ramp to I-83 Southbound.
|

(6/22/2009 SR0015-006)
|
Placement of concrete mountable curb on Lower Allen Drive.
|

(6/22/2009 SR0015-006)
|
US 15 over Lower Allen Drive bridge general construction progress photo.
|

(6/12/2009 SR0015-006)
|
Placement of High Performance Concrete bridge deck on US 15 bridge over Lower Allen Drive.
|

(6/12/2009 SR0015-006)
|
Placement of High Performance Concrete bridge deck on US 15 bridge over Lower Allen Drive.
|