I-81, Exit 44 Improvement Project - New Progress Photos

Click the thumbnail image for a larger view.

(7/7/2010 SR0465-003)
No. 2A Subbase along NB I-81.


(7/7/2010 SR0465-003)
Ramp E Subbase.


(7/7/2010 SR0465-003)
Ramp E (SB Allen Road to NB I-81) Subbase at Left; Ramp B (NB I-81 to SR 465) Concrete Pavemen at Right.


(7/7/2010 SR0465-003)
Placement of No. 2A Subbase along NB I-81 and Ramp E (On-Ramp from SB Allen Road to NB I-81).


(7/7/2010 SR0465-003)
Formwork placement for Abutment 2 and Wing 'A' footings.


(7/7/2010 SR0465-003)
Rebar placement within Abutment 1 and Abutment 2 Footings.


(7/7/2010 SR0465-003)
Placement of No. 2A Subbase along I-81 NB.


(7/7/2010 SR0465-003)
Continuing construction of Abutment 2 and Wing 'D' of S-26340 (I-81 Bridge over SR 465).